Related Permit Details
Application/Permit Information
Application/Permit Number:
Application Type:
Application Date:
Status:
Project Name:
Project Description:
Type | Status | Outcome | Cost | Date | Inspector | Checklist | Inspector Notes | General Notes |
---|---|---|---|---|---|---|---|---|
Electrical - Rough In | Passed | Approved | April 15, 2021 10:15 AM | Richard Windon | 4th and 3rd fl corridors | |||
Electrical - Final | Canceled | Not Applicable | October 18, 2021 12:00 AM | Chris Januzys | Need revised drawings for buck booster change and new transformers added for elevator equipment | |||
Electrical - Spot Check | Available | |||||||
Electrical - Service Pole | Available | |||||||
Electrical - Temporary Service | Available | |||||||
Electrical - Above Ceiling | Passed | Approved | May 27, 2021 12:00 AM | Brian Curran | Partial ceiling in club house | |||
Electrical - Stocking | Available | |||||||
Electrical - Underground | Available | |||||||
Electrical - Panels/Service | Available | |||||||
Electrical - Roof Top | Available | |||||||
Electrical - Floor Heat | Available | |||||||
Electrical - Rough In | Passed | Approved | April 21, 2021 10:02 AM | Richard Windon | 2nd fl corridors | |||
Electrical - Rough In | Passed | Approved | April 26, 2021 12:00 AM | Brandon Baird | 1st floor corridors on Phase 1 | |||
Electrical - Rough In | Passed | Approved | May 12, 2021 12:00 AM | Brandon Baird | Phase 1 satirs only. Second phase stairs needs more nail plating. | |||
Electrical - Rough In | Passed | Approved | May 14, 2021 12:00 AM | Brian Curran | Phase 2 stairs | |||
Electrical - Rough In | Failed | Disapproved | May 19, 2021 12:00 AM | Brandon Baird | Phase 2 for 2nd and 3rd floor second corridors only. On third floor at elevator two light boxes hanging from NM cable | |||
Electrical - Rough In | Passed | Approved | May 21, 2021 12:00 AM | Brandon Baird | Rest of corridors on phase 2. First floor and office area on second floor part of clubhouse. | |||
Electrical - Above Ceiling | Failed | Disapproved | May 28, 2021 11:41 AM | Preston Byrd | Clubhouse Hard ceiling 1st floor mens bathroom, Wire exhaust fan and install framing for access door. 1st floor lobby high ceiling need to complete. | |||
Electrical - Above Ceiling | Passed | Approved | November 19, 2021 9:01 AM | Chris Januzys | All rough ins are complete | |||
Electrical - Above Ceiling | Passed | Approved | May 28, 2021 11:44 AM | Preston Byrd | See failed report from 5-28. All other areas on 1st and 2nd floor OK. | |||
Electrical - Rough In | Passed | Approved | June 4, 2021 9:49 AM | Richard Windon | above ceiling for lobby and two bathrooms | |||
Electrical - Final | Passed | Approved for Occupancy | November 19, 2021 12:00 AM | Chris Januzys | Corrections made | |||
Electrical - Final | Failed | Disapproved | October 29, 2021 1:48 PM | Chris Januzys | 1,2,3,& 4th floors halls and mech/elect/tele rooms. 1-Label all equipment disconnects, panels, fire alarm panels and equipments, transformers and panel schedules. 2-Strap conduit, NM cable and flex per code in all mechanical /Electrical/Tele Data rooms 3-Need Ground electrode for elevator transformer 4-Install correct fuses for elevator equipment and transformer 5-Install panel fillers for missing breakers 6-Install Grounding bushings on line and load side of transformer 7-Remove (2) wires under (1) ground lug in several locations |