BUILDING - Footing |
Passed |
Approved |
|
September 22, 2020 6:11 PM |
Adrienne Harrington |
|
Approved for 3rd party Inspections per Department Guidelines |
|
BUILDING - Foundation |
Passed |
Approved |
|
September 30, 2020 3:07 PM |
Karey McConnell |
|
Approved for 3rd party Inspections per Department Guidelines
|
|
BUILDING - Slab |
Passed |
Not Applicable |
|
January 12, 2021 7:27 AM |
Adrienne Harrington |
|
Approved for 3rd party Inspections per Department Guidelines |
|
BUILDING - Framing |
Passed |
Approved |
|
March 2, 2021 12:00 AM |
Adrienne Harrington |
|
Exterior Sheathing / Shear Walls -- Nailing for Building Wrap
|
|
BUILDING - Insulation |
Failed |
Disapproved |
|
March 11, 2021 12:00 AM |
Adrienne Harrington |
|
Pre-Rock for Concealed Space -- 1) Unit 2719 - Seal marked top plate penetration at threaded rod |
|
BUILDING - Framing |
Passed |
Approved |
|
April 29, 2021 9:19 AM |
Steve Crist |
|
Exterior sheathing amenities wing building 7 |
|
BUILDING - Framing |
Passed |
Approved |
|
February 4, 2021 12:23 PM |
Adrienne Harrington |
|
Bldg 7 - Stairtower Firewall -- Observes 2-Layer Sheetrock |
|
BUILDING - Framing |
Passed |
Approved |
|
April 26, 2021 11:04 AM |
Steve Crist |
|
Prerock south wing building 7 4 floors over rec center |
|
BUILDING - Framing |
Passed |
Approved |
|
April 28, 2021 7:15 AM |
Steve Crist |
|
Exterior shear wall sheathing inspection amenities area of building 7. |
|
BUILDING - Framing |
Passed |
Approved |
|
May 11, 2021 7:38 AM |
Steve Crist |
|
Roof trusses units above amenities center 6 units |
|
BUILDING - Insulation |
Passed |
Approved |
|
May 28, 2021 7:20 AM |
Steve Crist |
|
Amenities center insulation |
|
BUILDING - Framing |
Passed |
Approved |
|
June 9, 2021 11:09 AM |
Steve Crist |
|
1st layer and RC channel on 2 story section of amenities center. |
|
BUILDING - Footing |
Passed |
Not Applicable |
|
October 13, 2020 6:11 AM |
Julian Arroyo |
|
Approved for 3rd party Inspections per Department Guidelines |
|
BUILDING - Slab |
Passed |
Not Applicable |
|
January 19, 2021 11:10 AM |
Peter Gervais |
|
Approved for 3rd party Inspections per Department Guidelines
|
|
BUILDING - Spot Check |
Passed |
Not Applicable |
|
March 10, 2021 12:00 AM |
Adrienne Harrington |
|
Discuss Pre-Rock for Concealed Space Protocol/Procedure |
|
BUILDING - Insulation |
Passed |
Approved |
|
March 12, 2021 12:00 AM |
Adrienne Harrington |
|
Pre-Rock for Concealed Space at Bathrooms (40 Units) |
|
BUILDING - Spot Check |
|
Not Applicable |
|
March 18, 2021 11:17 AM |
Wyatt Blalock |
|
It has been brought to our attention that there has been a change in design for the balcony floor and ceiling composition. Please advise as to when this will be submitted for approval by DCCID as it may impact prior document approvals by Building and Fire Prevention. |
|
BUILDING - Framing |
Failed |
Disapproved |
|
April 15, 2021 2:51 PM |
Steve Crist |
|
Partial Framing: 4th floor roof truss bracing. 1 truss brace missed GR309 in unit 7419 ( Building 7) |
|
BUILDING - Framing |
Passed |
Approved |
|
April 19, 2021 11:11 AM |
Karey McConnell |
|
Club House Columns Approved 1st and 2nd Floor 1st Layer Only. Sheetrock Fireproofing around steel columns and beams. |
|
BUILDING - Framing |
Passed |
Approved |
|
April 20, 2021 11:22 AM |
Steve Crist |
|
Partial Framing: 4th floor wall framing-10 units |
|
BUILDING - Framing |
Passed |
Approved |
|
April 21, 2021 9:42 AM |
Steve Crist |
|
Partial framing 3rd floor wall and ceiling approved |
|
BUILDING - Framing |
Passed |
Approved |
|
April 22, 2021 2:27 PM |
Steve Crist |
|
Partial framing 2nd floor full framing |
|
BUILDING - Framing |
Passed |
Approved |
|
April 23, 2021 2:36 PM |
Steve Crist |
|
1st floor, final floor of full framing approved 10 units |
|
BUILDING - Insulation |
Passed |
Approved |
|
April 26, 2021 11:04 AM |
Steve Crist |
|
Level 3 & 4 building 7 walls and ceilings batt insulation. Ceiling optional insulation with 5/8 sheetrock but has sound batts. |
|
BUILDING - Insulation |
Passed |
Approved |
|
April 28, 2021 7:15 AM |
Steve Crist |
|
Level 1 and 2 wall insulation, optional ceiling insulation for sound |
|
BUILDING - Framing |
Passed |
Approved |
|
May 4, 2021 8:03 AM |
Steve Crist |
|
Ceiling/floor trusses above amenities center before hanging rated ceiling and insulating rim joist |
|
BUILDING - Insulation |
Passed |
Approved |
|
May 5, 2021 2:09 PM |
Steve Crist |
|
Interstitial rim joist insulation above ceiling of amenities center. |
|
BUILDING - Insulation |
Passed |
Approved |
|
May 6, 2021 6:49 AM |
Steve Crist |
|
North stair tower #2 batted walls, ceiling is on top of roof |
|
BUILDING - Insulation |
Passed |
Approved |
|
May 11, 2021 7:38 AM |
Steve Crist |
|
Wall and ceiling 8 units adjacent to junction to amenities center 4 floors, Rim joist and top of wall in amenities center |
|
BUILDING - Framing |
Passed |
Approved |
|
May 11, 2021 7:38 AM |
Steve Crist |
|
1st layer ceiling of amenities center, top of walls pre-rock,RC channel amenities center |
|
BUILDING - Framing |
Passed |
Approved |
|
May 17, 2021 7:42 AM |
Steve Crist |
|
Remainder of framing in activities center |
|
BUILDING - Framing |
Passed |
Approved |
|
May 20, 2021 7:57 AM |
Steve Crist |
|
2nd, 3rd, 4th floors wall framing and floor trusses. 15 units |
|
BUILDING - Insulation |
Passed |
Approved |
|
May 25, 2021 3:57 PM |
Adrienne Harrington |
|
Level 3; Units above Clubhouse (3701-3707 Units) -- RC Channel placed / Batts in Walls and Ceiling |
|
BUILDING - Framing |
Canceled |
Not Applicable |
|
May 28, 2021 12:00 AM |
Steve Crist |
|
|
|
BUILDING - Framing |
Failed |
Disapproved |
|
May 28, 2021 7:20 AM |
Steve Crist |
|
Chase next to 2 story area needs fire block at top |
|
BUILDING - Spot Check |
|
Not Applicable |
|
May 28, 2021 12:36 PM |
Randall Stewart |
|
approved field change drawings attached |
|
BUILDING - Final/Multi-Family |
Failed |
Disapproved |
|
November 17, 2021 12:00 AM |
Peter Gervais |
|
4th floor: Unit 1 only: Seal all holes in mechanical closet - 4th floor Utility space only: seal holes between floors - Note: no above ceiling inspections recorded, no brick tie or lintel inspections recorded - reschedule inspection when ready - Provide all paperwork: 3rd party inspections, structural framing, slabs, etc. Accessibility letter, roof compliance verfication, Elevator shafts report, foundation survey, etc |
|
BUILDING - Final/Multi-Family |
Failed |
Disapproved |
|
November 18, 2021 6:29 AM |
Steve Crist |
|
Fire seal lines and conduits in utility closets 7412 and 7415 16 units inspected |
|
BUILDING - Final/Multi-Family |
Passed |
Approved for Occupancy |
|
November 19, 2021 7:36 AM |
Steve Crist |
|
Partial final 1st floor 10 units |
|
BUILDING - Final/Multi-Family |
Passed |
Approved for Occupancy |
|
November 23, 2021 7:57 AM |
Steve Crist |
|
Partial final 2nd floor 14 units |
|
BUILDING - Final/Multi-Family |
Passed |
Approved for Occupancy |
|
November 30, 2021 7:50 AM |
Steve Crist |
|
Partial final, 3rd floor 16 units and elevator shaft |
|
BUILDING - Spot Check |
Canceled |
Not Applicable |
|
December 1, 2021 12:00 AM |
Steve Crist |
|
|
|
BUILDING - Final |
Passed |
Approved for Occupancy |
|
December 1, 2021 7:56 PM |
Steve Crist |
|
Partial final: Sealing last 3 units 4th floor. Only rail returns in activity center and accessibility letter required to complete |
|
BUILDING - Final/Multi-Family |
Passed |
Approved for Occupancy |
|
December 3, 2021 7:48 AM |
Steve Crist |
|
Final check of rail returns in amenities center. All paperwork complete // Plumbing, foundation, engineering, transportation, city stormwater, cross connection sign offs required. |
|
BUILDING - Final/Multi-Family |
Passed |
Approved for Occupancy |
|
May 23, 2022 8:41 AM |
Steve Crist |
|
Trash room door changes approved |
|