Type | Status | Outcome | Cost | Date | Inspector | Checklist | Inspector Notes | General Notes |
---|---|---|---|---|---|---|---|---|
Plumbing - Water Heater | Available | |||||||
Plumbing - Water Service | Available | |||||||
Plumbing - Below Slab | Available | |||||||
Plumbing - Rough In | Available | |||||||
Plumbing - Spot Check | Available | |||||||
Plumbing - Final | Canceled | Not Applicable | October 21, 2024 12:00 AM | Chris Clark | ||||
Plumbing - Irrigation | Available | |||||||
Plumbing - Above Ceiling | Available | |||||||
Plumbing - Sewer | Failed | Disapproved | August 27, 2024 8:40 AM | Chris Clark | Ditch is not safe to enter to check grade on pipe. ( Ditch must meet OSHA rules for trench excavation ). The entire ditch must be uncovered. A safety ladder needs to be in the ditch. | |||
Plumbing - Storm Drainage | Available | |||||||
Plumbing - Stocking | Available | |||||||
Plumbing - Sewer | Failed | Disapproved | 100 | August 29, 2024 9:13 AM | Chris Clark | Ditch is still unsafe. Ditch must meet OSHA regulations. ( Ditch is 10 foot deep, 7 foot wide ) Ditch must be steped back ratio of 1 1/2 horizontal to 1 vertical. ( See previous inspection ) | ||
Plumbing - Sewer | Failed | Disapproved | August 30, 2024 9:08 AM | Chris Clark | Ditch is 10 foot deep. OSHA regulations must be met for inspector to enter ditch. 3/4 pine plywood does not meet OSHA standards. | |||
Plumbing - Sewer | Passed | Approved | September 5, 2024 9:29 AM | Chris Clark | ||||
Plumbing - Final | Canceled | Not Applicable | October 24, 2024 12:00 AM | Chris Clark | ||||
Plumbing - Final | Failed | Disapproved | November 13, 2024 9:16 AM | Chris Clark | Walked 3rd floor, all is good except need trap primers for hub drains | |||
Plumbing - Final | Failed | Disapproved | November 15, 2024 2:12 PM | Chris Clark | All tubs on all floors need to be sealed at the floor, Water main in the riser room needs to be insulated. Or heater installed. Missing vaccum breaker on boiler drain in riser room. Need Cleanouts installed in the breeze way. | |||
Plumbing - Final | Passed | Approved for Occupancy | December 3, 2024 11:54 AM | Michael Jar |