Electrical - Rough In |
Failed |
Disapproved |
100 |
May 5, 2023 7:48 AM |
Chris Januzys |
|
1-Replace damaged 10/3 going to dryer outlet
2-10/2 on 2nd floor at stairs/laundry needs to be re-worked, pinched between (2) 2x4 studs possible damaged wiring
3-14/2 right past laundry on 2nd floor has damage right before rec box
4-Staple flat cables flat
5-Need additional running boards around attic platform
6-Tighten NM connector for feeder to sub panel |
|
Electrical - Final |
Failed |
Disapproved |
|
June 29, 2023 8:51 AM |
Ron Watson |
|
remove ground wire in seervice conduit #2 strap wire in attic to unit #3 ARC fault trips when upstairs hall switch is turn on |
|
Electrical - Spot Check |
Available |
|
|
|
|
|
|
|
Electrical - Service Pole |
Available |
|
|
|
|
|
|
|
Electrical - Temporary Service |
Available |
|
|
|
|
|
|
|
Electrical - Above Ceiling |
Available |
|
|
|
|
|
|
|
Electrical - Stocking |
Available |
|
|
|
|
|
|
|
Electrical - Underground |
Available |
|
|
|
|
|
|
|
Electrical - Panels/Service |
Available |
|
|
|
|
|
|
|
Electrical - Roof Top |
Available |
|
|
|
|
|
|
|
Electrical - Floor Heat |
Available |
|
|
|
|
|
|
|
Electrical - Rough In |
Passed |
Approved |
|
May 9, 2023 8:25 AM |
Ron Watson |
|
|
|
Electrical - Final |
Passed |
Approved for Occupancy |
|
July 6, 2023 8:33 AM |
Ron Watson |
|
|
|