BUILDING - Footing |
Passed |
Not Applicable |
|
April 5, 2023 11:38 AM |
Todd Miller |
|
DPIF attached |
|
BUILDING - Foundation |
Passed |
Approved |
|
April 5, 2023 11:38 AM |
Todd Miller |
|
Vented crawlspaces |
|
BUILDING - Slab |
Available |
|
|
|
|
|
|
|
BUILDING - Framing |
Failed |
Disapproved |
|
May 10, 2023 2:03 PM |
Todd Miller |
|
1) Install X bracing per plans - note: joist repairs are correct - grade and drain crawlspaces prior to final |
|
BUILDING - Insulation |
Passed |
Approved |
|
May 12, 2023 12:51 PM |
Randall Stewart |
|
both sides. batt insulation in walls and concealed areas per code |
|
BUILDING - Final |
Failed |
Disapproved |
|
July 17, 2023 8:42 AM |
Michael Glass |
|
1. Engery Certificates at sinks both units. 2. Could not check second floor due to wet steps. 3. Need two Foundation vent wells at "D" unit at fornt anf under front porch. 4 Foundation Survey not attached |
|
BUILDING - Spot Check |
Available |
|
|
|
|
|
|
|
BUILDING - Other |
Available |
|
|
|
|
|
|
|
BUILDING - Angle |
Available |
|
|
|
|
|
|
|
BUILDING - Final/Multi-Family |
Available |
|
|
|
|
|
|
|
BUILDING - Above Ceiling |
Available |
|
|
|
|
|
|
|
BUILDING - Stocking |
Available |
|
|
|
|
|
|
|
BUILDING - Framing |
Passed |
Approved |
|
May 12, 2023 12:51 PM |
Randall Stewart |
|
reinspection previous items both sides |
|
BUILDING - Final |
Failed |
Disapproved |
|
July 19, 2023 12:00 AM |
Peter Gervais |
|
New item: D unit only, 2nd floor windows are less than 24 inches from finished floor and need a child saftey lock that complies with ASTM 2090 - previous items completed |
|
BUILDING - Final |
Passed |
Approved for Occupancy |
|
July 20, 2023 11:58 AM |
Shaun Liggett |
|
final approved- previous items complete- co pending engineering signoff |
|