Related Permit Details
Application/Permit Information
Application/Permit Number:
Application Type:
Application Date:
Status:
Project Name:
Project Description:
| Type | Status | Outcome | Cost | Date | Inspector | Checklist | Inspector Notes | General Notes |
|---|---|---|---|---|---|---|---|---|
| Plumbing - Water Heater | Available | |||||||
| Plumbing - Water Service | Available | |||||||
| Plumbing - Below Slab | Failed | Disapproved | December 15, 2022 10:47 AM | Chris Clark | Ditches are full of water, Need to verify all plumbing by the city stamped approved drawings. | |||
| Plumbing - Rough In | Failed | Disapproved | January 10, 2023 10:08 AM | Chris Clark | Wood 2x6 backing is required for all wall hung china sinks. | |||
| Plumbing - Spot Check | Available | |||||||
| Plumbing - Final | Failed | Disapproved | 100 | June 21, 2023 11:27 AM | Chris Clark | ADA Bathroom unit 106 water closet seat must be an open face seat for public use, Must have 60 inches from side wall to edge of Lav, Water closet must be 16-18 inches off of side wall, Pedistal sink is not listed on the approved fixture schedule, ( Does not Meet ADA ) Water closet in room 111 must be 12 inches off of side wall, Water closet in room 110 must be 12 inches off of side wall. ( See A-3 3.06 drawing of the approved city stamped drawings ) | ||
| Plumbing - Irrigation | Available | |||||||
| Plumbing - Above Ceiling | Available | |||||||
| Plumbing - Sewer | Failed | Disapproved | 100 | December 15, 2022 10:47 AM | Chris Clark | Ditch is full of water, un abe to see pipe and verify grade. | ||
| Plumbing - Storm Drainage | Available | |||||||
| Plumbing - Stocking | Available | |||||||
| Plumbing - Below Slab | Passed | Approved | December 20, 2022 10:03 AM | Chris Clark | ||||
| Plumbing - Sewer | Failed | Disapproved | 100 | December 20, 2022 10:03 AM | Chris Clark | Remove all water and mud from ditch,· Sewer is not bedded/bedded in mud; buried pipe must be supported throughout it's entire length (306.1) | ||
| Plumbing - Sewer | Failed | Disapproved | 100 | December 21, 2022 11:00 AM | Chris Clark | All water and mud must be removed from ditch before you and bed pipe with solid material. Putting sand on top of mud and water will not pass inspection. Sewer is not bedded/bedded in mud; buried pipe must be supported throughout it's entire length (306.1) | ||
| Plumbing - Sewer | Passed | Approved | December 30, 2022 11:37 AM | Michael Jar | ||||
| Plumbing - Rough In | Passed | Approved | January 11, 2023 1:17 PM | Tom Williams | ||||
| Plumbing - Final | Failed | Disapproved | 200 | July 7, 2023 10:48 AM | Chris Clark | ADA bathroom toilet seat must be open face seat, Missing lav guards on lavatory, Toilet room 111 must be 12 inches off of side wall, ( See previous inspection ) | ||
| Plumbing - Final | Failed | Disapproved | July 13, 2023 11:17 AM | Chris Clark | ADA bathroom unit 106...water closet must be 16-18 inches off of side wall, ( See previous inspection from 6/21/23 ) | |||
| Plumbing - Final | Passed | Approved for Occupancy | July 14, 2023 9:26 AM | Chris Clark |