Electrical - Rough In |
Canceled |
Not Applicable |
|
July 20, 2023 12:00 AM |
Larry Williams |
|
Contractor called ( Gonzo) to cancel, sent in wrong inspection. Need inspection for island loops at building 1. |
|
Electrical - Final |
Available |
|
|
|
|
|
|
|
Electrical - Spot Check |
Available |
|
|
|
|
|
|
|
Electrical - Service Pole |
Available |
|
|
|
|
|
|
|
Electrical - Temporary Service |
Failed |
Disapproved |
|
June 7, 2024 2:05 PM |
Duane Chamberlain |
|
Need a separate temp power permit. |
|
Electrical - Above Ceiling |
Available |
|
|
|
|
|
|
|
Electrical - Stocking |
Available |
|
|
|
|
|
|
|
Electrical - Underground |
Passed |
Approved |
|
November 3, 2022 9:26 AM |
Duane Chamberlain |
|
Slab island conduits. |
|
Electrical - Panels/Service |
Available |
|
|
|
|
|
|
|
Electrical - Roof Top |
Available |
|
|
|
|
|
|
|
Electrical - Floor Heat |
Available |
|
|
|
|
|
|
|
Electrical - Rough In |
Failed |
Disapproved |
|
September 15, 2023 3:34 PM |
Duane Chamberlain |
|
1. Need to seal or replace all multi gang boxes where NM clamps are completely broken out.
2. NM cables must be into the boxes at least 1/4", at multiple locations throughout.
3. NM cables stapled on end in several locations, NM must be stapled stapled flat.
4. NM cables stapled less than 1 1/4" from edge of stud throughout. |
|
Electrical - Rough In |
Passed |
Approved |
|
September 18, 2023 9:44 AM |
Duane Chamberlain |
|
Corrections made.
|
|
Electrical - Temporary Service |
Pending |
|
|
|
|
|
|
|