Mechanical - Gas Piping | Available | |||||||
Mechanical - Final | Passed | Approved | October 22, 2021 9:43 AM | Willie Hunter | 1st floor Children Pharmacy area | |||
Mechanical - Replacement | Available | |||||||
Mechanical - Above Ceiling | Failed | Disapproved | January 20, 2021 10:39 AM | Gary Wheeler | This is an above ceiling inspection for the hard ceilings in the area for Starbucks. Not ready for above ceiling inspection. Flex not ran, grills not framed out, access doors in duct not labeled, I have questions concerning access for service and adequate room to replace unit above hard ceiling. | |||
Mechanical - Rough In | Available | |||||||
Mechanical - Spot Check | Available | |||||||
Mechanical - Final | Passed | Approved | April 16, 2020 12:00 AM | Gary Wheeler | sections 1A 2A and 2B | |||
Mechanical - Final | Passed | Approved for Occupancy | November 12, 2021 1:14 PM | Gary Wheeler | ||||
Mechanical - Duct Seal | Passed | Approved | March 19, 2019 12:00 AM | Gary Wheeler | Duct seal inspection in basement for supply and return duct as marked on drawings 3/19 | |||
Mechanical - Duct Seal | Canceled | Not Applicable | May 31, 2019 12:00 AM | Gary Wheeler | ||||
Mechanical - Duct Seal | Passed | Approved | June 4, 2019 12:00 AM | Gary Wheeler | duct seal inspection for west side of OT level, OB level 90% compete , 00 level pharmacy area. Per marked drawings dated 6/4 gw | |||
Mechanical - Duct Seal | Passed | Approved | June 13, 2019 12:00 AM | Gary Wheeler | Duct seal on chase duct as marked on plans for 6/13/19,. bathroom exhaust, return duct and stairway pressurisation ducts in chases | |||
Mechanical - Duct Seal | Passed | Approved | June 18, 2019 2:51 PM | Gary Wheeler | duct seal on all duct on 1st floor except duct in racks, OK to duct seal | |||
Mechanical - Duct Seal | Passed | Approved | June 27, 2019 12:00 AM | Gary Wheeler | duct seal on ducts in racks on first floor, ok to insulate | |||
Mechanical - Duct Seal | Passed | Approved | July 16, 2019 1:25 PM | Gary Wheeler | ok to insulate all duct work on 1st floor | |||
Mechanical - Duct Seal | Passed | Approved | July 16, 2019 1:25 PM | Gary Wheeler | ok to insulate all duct except duct in racks 2nd floor | |||
Mechanical - Rough In | Passed | Approved | July 22, 2019 12:00 AM | Gary Wheeler | pressure test on HHW copper lines 1 st floor A area | |||
Mechanical - Duct Seal | Passed | Approved | August 5, 2019 11:50 AM | Gary Wheeler | all 3rd floor duct work ok to insulate | |||
Mechanical - Duct Seal | Passed | Approved | August 5, 2019 11:50 AM | Gary Wheeler | 2nd floor racks, not going to require this inspection anymore only need insulation inspection on racks to see repairs to insulation where it was cut. Contractor to provide pressure test paperwork at insulation inspections | |||
Mechanical - Rough In | Passed | Approved | August 5, 2019 11:50 AM | Gary Wheeler | framing around FDs and FSDs on marked dampers on plans for 1st and 2nd floors marked on prints in Dean's office | |||
Mechanical - Rough In | Passed | Approved | August 5, 2019 11:50 AM | Gary Wheeler | 1st floor B side hydronic piping this completes all 1st floor piping from tie in at shafts to boxes for pressure tests | |||
Mechanical - Duct Seal | Passed | Approved | August 19, 2019 1:18 PM | Gary Wheeler | passed 4th floor duct seal, all duct expect rack duct which I am not doing duct seal inspections on any longer | |||
Mechanical - Rough In | Passed | Approved | August 19, 2019 1:18 PM | Gary Wheeler | pressure test on HHW on the entire 2nd floor from the valve at the riser to the valve at the boxes. | |||
Mechanical - Duct Seal | Passed | Approved | August 19, 2019 1:18 PM | Gary Wheeler | duct seal on all chase duct through the 4th floor | |||
Mechanical - Above Ceiling | Passed | Approved | September 5, 2019 2:42 PM | Gary Wheeler | ok to sheetrock ceilings on nurses stations in halls between rooms on 1st and 2nd floors | |||
Mechanical - Duct Seal | Passed | Approved | September 12, 2019 1:16 PM | Gary Wheeler | stair pressurization duct ok to close chase through the 4th floor, ok to insulate up to 7th floor | |||
Mechanical - Rough In | Passed | Approved | September 12, 2019 1:16 PM | Gary Wheeler | ok to build chase up through 7th floor | |||
Mechanical - Above Ceiling | Passed | Approved | September 12, 2019 1:16 PM | Gary Wheeler | ok to sheetrock ceiling in corner of 1st floor lobby as marked on prints | |||
Mechanical - Duct Seal | Passed | Approved | September 12, 2019 1:16 PM | Gary Wheeler | ok to insulate all duct on 7th floor minus chases | |||
Mechanical - Above Ceiling | Passed | Approved | September 12, 2019 1:16 PM | Gary Wheeler | ok to sheetrock ceilings in isolation rooms on 2nd floor including nurse's alcove for those rooms | |||
Mechanical - Rough In | Passed | Approved | September 12, 2019 1:16 PM | Gary Wheeler | ok to build chases around duct in garbage chute rooms 3rd and 4th floors | |||
Mechanical - Rough In | Passed | Approved | September 25, 2019 12:00 AM | Gary Wheeler | Hydro test- chill water mains on basement level from pumps to valves on OT level 150 psi | |||
Mechanical - Duct Seal | Passed | Approved | September 25, 2019 10:59 AM | Gary Wheeler | entire 8th floor except shafts | |||
Mechanical - Duct Seal | Passed | Approved | September 25, 2019 10:59 AM | Gary Wheeler | duct seal inspection on supply shaft west of west core stair ok to insulate | |||
Mechanical - Rough In | Passed | Approved | October 14, 2019 11:03 AM | Gary Wheeler | framing on all fire dampers on 3rd floor except where noted on plans | |||
Mechanical - Duct Seal | Passed | Approved | October 14, 2019 11:03 AM | Gary Wheeler | duct seal inspection entire 9th floor except for shafts | |||
Mechanical - Rough In | Passed | Approved | October 21, 2019 11:25 AM | Gary Wheeler | hydro test loops of HHW from shafts to valves on boxes 3rd floor A&B sides | |||
Mechanical - Rough In | Passed | Approved | October 21, 2019 11:25 AM | Gary Wheeler | ok to sheetrock alcoves on 3rd foor B side only | |||
Mechanical - Rough In | Passed | Approved | October 30, 2019 1:42 PM | Gary Wheeler | duct seal on all shafts up to roof approved, ok to close all shafts up to roof except the 2 shafts that have supply duct and the one with the pharmacy exhaust | |||
Mechanical - Above Ceiling | Passed | Approved | October 30, 2019 1:42 PM | Gary Wheeler | above ceiling approved for all alcoves 3rd floor A side | |||
Mechanical - Rough In | Passed | Approved | November 7, 2019 12:00 AM | Gary Wheeler | fire damper framing entire 6th floor and east supply shaft FD 2nd,3rd and 4th floors | |||
Mechanical - Rough In | Passed | Approved | November 7, 2019 12:00 AM | Gary Wheeler | HHW presure test 4 th floor | |||
Mechanical - Above Ceiling | Passed | Approved | November 7, 2019 12:00 AM | Gary Wheeler | all alcoves 6th floor B side ok to sheetrock | |||
Mechanical - Duct Seal | Passed | Approved | November 15, 2019 12:00 AM | Gary Wheeler | Duct seal inspection all duct levels 10 and 11 | |||
Mechanical - Duct Seal | Passed | Approved | November 15, 2019 12:00 AM | Gary Wheeler | completed ductseal on all shafts up to roof | |||
Mechanical - Rough In | Passed | Approved | November 15, 2019 12:00 AM | Gary Wheeler | ok to sheetrock all alcoves on level 7 | |||
Mechanical - Rough In | Passed | Approved | November 20, 2019 12:00 AM | Gary Wheeler | level 8 FD framing | |||
Mechanical - Rough In | Passed | Approved | November 20, 2019 12:00 AM | Gary Wheeler | pressure test on HHW piping entire 6th floor | |||
Mechanical - Rough In | Passed | Approved | November 20, 2019 12:00 AM | Gary Wheeler | Pressure test on HHW in basement from valves on OT level to valves AHU prior to headers. | |||
Mechanical - Rough In | Passed | Approved | December 3, 2019 12:00 AM | Gary Wheeler | HHW riser from OO level valaves to loop on roof at RTU's | |||
Mechanical - Rough In | Passed | Approved | December 3, 2019 2:53 PM | Gary Wheeler | HHW loop on 7th floor A and B sides | |||
Mechanical - Rough In | Passed | Approved | December 3, 2019 2:53 PM | Gary Wheeler | OK to close all shafts up to roof including east supply shaft and stair pressurization shaft | |||
Mechanical - Duct Seal | Passed | Approved | December 11, 2019 12:00 AM | Gary Wheeler | east stair pressurization duct ok to insulate | |||
Mechanical - Duct Seal | Passed | Approved | December 11, 2019 12:00 AM | Gary Wheeler | far east bathroom exhaust riser duct seal up to roof | |||
Mechanical - Rough In | Passed | Approved | December 13, 2019 12:00 AM | Gary Wheeler | ok to build dog houses on OT level west of the loading dock | |||
Mechanical - Above Ceiling | Passed | Approved | December 13, 2019 12:00 AM | Gary Wheeler | alcoves all of 7th and 8th floors gw | |||
Mechanical - Rough In | Passed | Approved | December 20, 2019 3:18 PM | Gary Wheeler | HHW pressure test entire 8th floor | |||
Mechanical - Rough In | Passed | Approved | January 14, 2020 10:19 AM | Gary Wheeler | OK to wrap duct on AHU #1 west of stairs from unit to filter box and to roof pnetration on rest of it. | |||
Mechanical - Rough In | Passed | Approved | January 14, 2020 10:19 AM | Gary Wheeler | Fire damper framing entire 9th floor | |||
Mechanical - Rough In | Passed | Approved | January 14, 2020 10:19 AM | Gary Wheeler | Ok to insulate stair pressurazation duct in east stair | |||
Mechanical - Rough In | Passed | Approved | January 14, 2020 10:19 AM | Gary Wheeler | HHW entire 9th floor pressure test | |||
Mechanical - Rough In | Passed | Approved | January 14, 2020 10:19 AM | Gary Wheeler | OK to build dog houses over rest of duct penetrations on OT level | |||
Mechanical - Rough In | Passed | Approved | January 22, 2020 11:32 AM | Gary Wheeler | framing around FD's on 10th floor | |||
Mechanical - Rough In | Passed | Approved | January 29, 2020 11:49 AM | Gary Wheeler | Framing on FD's on OB level for shafts | |||
Mechanical - Rough In | Passed | Approved | January 29, 2020 11:49 AM | Gary Wheeler | level 6 east shaft FD framing | |||
Mechanical - Rough In | Passed | Approved | January 29, 2020 11:49 AM | Gary Wheeler | east stairs pressuration duct insulation inspection all floors | |||
Mechanical - Rough In | Passed | Approved | January 29, 2020 11:49 AM | Gary Wheeler | 11th floor FD framing | |||
Mechanical - Rough In | Passed | Approved | January 29, 2020 11:49 AM | Gary Wheeler | 9th floor all alcoves | |||
Mechanical - Above Ceiling | Passed | Approved | January 29, 2020 11:49 AM | Gary Wheeler | 2nd floor moc up room | |||
Mechanical - Rough In | Passed | Approved | February 11, 2020 2:41 PM | Gary Wheeler | 10th floor HHW pressure test both sides | |||
Mechanical - Above Ceiling | Passed | Approved | March 27, 2020 12:00 AM | Gary Wheeler | 2A and 2B | |||
Mechanical - Rough In | Passed | Approved | February 17, 2020 2:27 PM | Gary Wheeler | 7th floor knuckle ok to sheetrock | |||
Mechanical - Above Ceiling | Passed | Approved | February 17, 2020 2:27 PM | Gary Wheeler | 6th floor ISO rooms | |||
Mechanical - Rough In | Passed | Approved | February 17, 2020 2:27 PM | Gary Wheeler | 4th floor knuckle ok to sheetrock | |||
Mechanical - Rough In | Passed | Approved | February 28, 2020 2:00 PM | Gary Wheeler | flashing on FD's in plenuim walls on OB level | |||
Mechanical - Rough In | Passed | Approved | March 6, 2020 1:24 PM | Gary Wheeler | pressure test on CW on OT level B side | |||
Mechanical - Rough In | Passed | Approved | March 13, 2020 12:00 AM | Gary Wheeler | completed pressure test on HHW for RTU #3, this completes the entire HHW system through the shafts to the coil | |||
Mechanical - Rough In | Passed | Approved | March 13, 2020 12:00 AM | Gary Wheeler | ok to insulate all duct on roof | |||
Mechanical - Rough In | Passed | Approved | March 13, 2020 12:00 AM | Gary Wheeler | ok to close shafts for A&B rocket launchers ( piping for RTU's ) * have a concern with the number of fittings if shafts and possibilites of leaks, met with Jose Torres of RMF engineering he has no issue is sending an emailing with his stamp concerning this. | |||
Mechanical - Rough In | Passed | Approved | March 13, 2020 12:00 AM | Gary Wheeler | ok to sheetrock ceilings in all alcoves 10th floor B side | |||
Mechanical - Above Ceiling | Passed | Approved | March 13, 2020 12:00 AM | Gary Wheeler | 7th floor ISO rooms | |||
Mechanical - Rough In | Passed | Approved | March 13, 2020 12:00 AM | Gary Wheeler | 1st floor B side pressure test | |||
Mechanical - Rough In | Passed | Approved | March 26, 2020 12:00 AM | Gary Wheeler | pressure test on rest of CW piping on OT level and CW piping on 1B | |||
Mechanical - Above Ceiling | Passed | Approved | March 27, 2020 12:00 AM | Gary Wheeler | 1A above ceiling insection | |||
Mechanical - Rough In | Passed | Approved | April 2, 2020 12:00 AM | Gary Wheeler | CW pressure test levels 4 & 6 | |||
Mechanical - Above Ceiling | Passed | Approved | April 2, 2020 12:00 AM | Gary Wheeler | 4th floor A side | |||
Mechanical - Rough In | Passed | Approved | April 8, 2020 12:00 AM | Gary Wheeler | CW pressure test and tie ins to AHU 1,2 and 3 on the roof | |||
Mechanical - Rough In | Passed | Approved | April 8, 2020 12:00 AM | Gary Wheeler | CW pressure test from rocket launchers to IT rooms on levels 8,9 and 10 also looked at condensate lines | |||
Mechanical - Rough In | Passed | Approved | April 8, 2020 12:00 AM | Gary Wheeler | pressure test on condensate lines from heat exchangers on OB level as well as final steam tie ins. | |||
Mechanical - Rough In | Passed | Approved | March 25, 2020 12:00 AM | Gary Wheeler | CW pressure test on 3rd floor | |||
Mechanical - Above Ceiling | Passed | Approved | April 28, 2020 12:00 AM | Gary Wheeler | ISO rooms and knuckles on 9 and 10 | |||
Mechanical - Above Ceiling | Passed | Approved | May 22, 2020 12:00 AM | Gary Wheeler | passed above ceiling on 3rd floor except for access to 3 VAVs that are marked on the plans | |||
Mechanical - Rough In | Passed | Approved | May 22, 2020 12:00 AM | Gary Wheeler | passed pressure test on lines to headers for AHUs B&C in basement | |||
Mechanical - Duct Seal | Passed | Approved | June 2, 2020 12:00 AM | Gary Wheeler | duct seal for stair pressurization fan #2 for penthouse out to fan on roof and rest of duct work from AHU#1 on roof from filter box to top of chase far west side of building | |||
Mechanical - Rough In | Passed | Approved | June 2, 2020 12:00 AM | Gary Wheeler | All alcoves 11th floor ok to sheetrock | |||
Mechanical - Rough In | Passed | Approved | June 2, 2020 12:00 AM | Gary Wheeler | pressure test for steam condensate for AHU's B&C and A in basement. | |||
Mechanical - Rough In | Passed | Approved | May 22, 2020 12:00 AM | Gary Wheeler | 11th floor CW piping pressure test | |||
Mechanical - Rough In | Passed | Approved | June 16, 2020 12:00 AM | Gary Wheeler | pressure test on glycol system on roof | |||
Mechanical - Above Ceiling | Passed | Approved | June 16, 2020 12:00 AM | Gary Wheeler | above ceiling for linear diffusers at former buk hoist area on 2nd and 3rd floor lobbies | |||
Mechanical - Above Ceiling | Passed | Approved | July 2, 2020 12:39 PM | Gary Wheeler | all of the 4th floor has past the above ceiling with the exception of the lobby area. I also looked in the electrical rooms and IT rooms | |||
Mechanical - Above Ceiling | Passed | Approved | July 8, 2020 12:00 AM | Gary Wheeler | hard ceilings lobbies on 8,7,6 and 4 | |||
Mechanical - Above Ceiling | Passed | Approved | July 8, 2020 2:04 PM | Gary Wheeler | 10th floor A side rooms only | |||
Mechanical - Above Ceiling | Passed | Approved | July 22, 2020 7:40 AM | Gary Wheeler | entire 6th floor except lobby drop ceiling area | |||
Mechanical - Above Ceiling | Passed | Approved | July 22, 2020 7:40 AM | Gary Wheeler | hard ceilings lobbies 9, 10 and 11 | |||
Mechanical - Rough In | Passed | Approved | July 24, 2020 7:57 AM | Gary Wheeler | Pressure test steam and condensate on RTU #1 | |||
Mechanical - Rough In | Passed | Approved | July 24, 2020 7:57 AM | Gary Wheeler | insulation on duct on P1 level ok to close shaft and ok to close shaft on 10th floor when duct penetrates ceiling in west corner of A area | |||
Mechanical - Above Ceiling | Passed | Approved | July 30, 2020 12:00 AM | Gary Wheeler | lobbies on 2ND and 3RD floors drop ceilings | |||
Mechanical - Above Ceiling | Passed | Approved | August 6, 2020 2:13 PM | Gary Wheeler | 7th floor above ceiling except lobby area | |||
Mechanical - Above Ceiling | Passed | Approved | August 11, 2020 1:03 PM | Gary Wheeler | lobbies floors 4 and 6 | |||
Mechanical - Above Ceiling | Passed | Approved | August 11, 2020 1:03 PM | Gary Wheeler | 11th floor ISO rooms | |||
Mechanical - Duct Seal | Passed | Approved | August 24, 2020 12:00 AM | Gary Wheeler | Duct seal low pressure duct in pharmacy | |||
Mechanical - Rough In | Passed | Approved | August 27, 2020 12:00 AM | Gary Wheeler | pressure test on piping in pharmacy | |||
Mechanical - Above Ceiling | Passed | Approved | August 28, 2020 12:00 AM | Gary Wheeler | above ceilings in lobbies on 7 and 8 | |||
Mechanical - Above Ceiling | Passed | Approved | August 28, 2020 12:00 AM | Gary Wheeler | above ceiling 8th floor | |||
Mechanical - Above Ceiling | Passed | Approved | September 18, 2020 12:00 AM | Gary Wheeler | 9th floor A side | |||
Mechanical - Rough In | Passed | Approved | September 18, 2020 12:00 AM | Gary Wheeler | pressure test on piping feeding other building in basement | |||
Mechanical - Rough In | Passed | Approved | September 18, 2020 12:00 AM | Gary Wheeler | fire wrap on in walls on pharmacy exhaust, I have questions on the fire wrap concerning the duct clean out doors, the FD's that are still in the exhaust and the fire wrap stopping at the exhaust boxes and re-starting | |||
Mechanical - Above Ceiling | Passed | Approved | September 24, 2020 12:00 AM | Gary Wheeler | Elevator lobbies 2nd and 3rd floors | |||
Mechanical - Above Ceiling | Passed | Approved | September 24, 2020 12:00 AM | Gary Wheeler | 9B above ceiling | |||
Mechanical - Above Ceiling | Passed | Approved | September 30, 2020 12:00 AM | Gary Wheeler | elevator lobbies at floor main lobbies floors 4-10 | |||
Mechanical - Rough In | Passed | Approved | September 30, 2020 12:00 AM | Gary Wheeler | ok to sheetrock soffits and hard ceilings ion conference rooms at end of hallway floors 4-9 | |||
Mechanical - Above Ceiling | Passed | Approved | October 9, 2020 12:00 AM | Gary Wheeler | Floor 10 A side and B side | |||
Mechanical - Above Ceiling | Passed | Approved | October 9, 2020 12:00 AM | Gary Wheeler | elevator lobby 11th floor ok to sheetrock ceiling | |||
Mechanical - Above Ceiling | Passed | Approved | November 13, 2020 11:30 AM | Gary Wheeler | above ceiling for 11A minus the conference room | |||
Mechanical - Above Ceiling | Passed | Approved | December 8, 2020 12:00 AM | Gary Wheeler | above ceiling on the six pack elevators lobbies 1-9 floors | |||
Mechanical - Above Ceiling | Passed | Approved | December 8, 2020 12:00 AM | Gary Wheeler | conference rooms at end of hallways floors 1-10 | |||
Mechanical - Above Ceiling | Passed | Approved | January 26, 2021 3:54 PM | Gary Wheeler | above ceiling for hard ceiling at Starbucks and high hard ceiling in main concourse | |||
Mechanical - Above Ceiling | Failed | Disapproved | 100 | February 10, 2021 10:32 AM | Gary Wheeler | provide adequate space to remove unit and coil from above sheetrock ceiling. The plan was to move other trades around at the edge of the drop ceiling to provide this space. This was not accomplished prior to this inspection. | ||
Mechanical - Above Ceiling | Passed | Approved | February 16, 2021 12:00 AM | Gary Wheeler | Starbuck's area only | |||
Mechanical - Duct Seal | Passed | Approved | March 4, 2021 11:43 AM | Gary Wheeler | ductwork feeding small conference room by Starbucks. Ok to fire wrap duck below the deck but need to provide UL detail on fire wrap also ok to insulate duct above decking. | |||
Mechanical - Final | Passed | Approved | March 5, 2021 3:29 PM | Gary Wheeler | 7th floor | |||
Mechanical - Final | Passed | Approved | March 5, 2021 3:29 PM | Gary Wheeler | 8th floor | |||
Mechanical - Rough In | Passed | Approved | March 22, 2021 1:32 PM | Gary Wheeler | ok to close shaft in 1st floor conference room by Starbucks | |||
Mechanical - Above Ceiling | Passed | Approved | March 22, 2021 1:32 PM | Gary Wheeler | Above ceiling inspection for 00 level main corridors including trash room and soiled linen room | |||
Mechanical - Rough In | Passed | Approved | March 26, 2021 11:39 AM | Gary Wheeler | looked at flashing on dog houses on OT level upto line drawn on prints in book | |||
Mechanical - Rough In | Passed | Approved | March 26, 2021 11:39 AM | Gary Wheeler | ok to build dog houses in plenum area that used to be the roof on existing hospital.on far east side of OT level | |||
Mechanical - Final | Passed | Approved | March 26, 2021 11:42 AM | Gary Wheeler | finals on floors 9,10 and 11 | |||
Mechanical - Rough In | Passed | Approved | March 30, 2021 11:00 AM | Gary Wheeler | flashing on fire dampers on OT level with the exception of the ones marked in the book on 3/29 | |||
Mechanical - Above Ceiling | Passed | Approved | March 30, 2021 12:00 AM | Gary Wheeler | as marked in the book on 3/29 | |||
Mechanical - Duct Seal | Failed | Disapproved | April 9, 2021 12:00 AM | George Patterson | No contact number provided | |||
Mechanical - Duct Seal | Passed | Approved | April 12, 2021 12:00 AM | Gary Wheeler | Cath lab | |||
Mechanical - Final | Passed | Approved | April 12, 2021 9:57 AM | Gary Wheeler | 00 level | |||
Mechanical - Rough In | Passed | Approved | April 12, 2021 9:57 AM | Gary Wheeler | soffit in conference room on 1st floor by starbucks | |||
Mechanical - Above Ceiling | Passed | Approved | May 13, 2021 1:50 PM | Gary Wheeler | small conference room by STAR BUCKS | |||
Mechanical - Final | Passed | Approved | July 9, 2021 12:19 PM | Gary Wheeler | small conference room by starbucks | |||
Mechanical - Above Ceiling | Passed | Approved | July 9, 2021 12:19 PM | Gary Wheeler | Cath lab and hallway directly in front of Cath Lab on 1st floor | |||
Mechanical - Final | Passed | Approved | August 5, 2021 12:00 AM | Gary Wheeler | Final on the roof | |||
Mechanical - Final | Passed | Approved | August 19, 2021 1:04 PM | Gary Wheeler | 4th floor | |||
Mechanical - Final | Passed | Approved | August 19, 2021 1:04 PM | Gary Wheeler | 3rd floor | |||
Mechanical - Final | Passed | Approved | October 14, 2021 12:00 AM | Gary Wheeler | 1st floor | |||
Mechanical - Final | Passed | Approved | October 14, 2021 12:00 AM | Gary Wheeler | 2nd floor | |||
Mechanical - Final | Passed | Approved for Conditional Occupancy | November 3, 2021 1:31 PM | Gary Wheeler | conditional final on building. need to complete install of exhaust hoods in pharmacy on 1st floor |