Related Permit Details
Application/Permit Information
Application/Permit Number:
Application Type:
Application Date:
Status:
Project Name:
Project Description:
Type | Status | Outcome | Cost | Date | Inspector | Checklist | Inspector Notes | General Notes |
---|---|---|---|---|---|---|---|---|
Plumbing - Water Heater | Available | |||||||
Plumbing - Final | Failed | Disapproved | July 1, 2020 10:25 AM | Chris Clark | 3rd Floor Locker room ADA issues, Need to recheck | |||
Plumbing - Below Slab | Available | |||||||
Plumbing - Rough In | Failed | Disapproved | April 11, 2019 2:59 PM | Chris Clark | Need contact number to meet someone on site | |||
Plumbing - Rough In | Passed | Approved | December 31, 2019 10:49 AM | Chris Clark | Shower pan test on second floor | |||
Plumbing - Final | Failed | Disapproved | April 16, 2020 10:19 AM | Chris Clark | Room 1st floor 80T, 2nd floor 002 , 2nd floor 80t, 68T handicape issues. Need to re check | |||
Plumbing - Rough In | Passed | Approved | June 4, 2020 11:21 AM | Chris Clark | ||||
Plumbing - Rough In | Passed | Approved | June 16, 2020 10:08 AM | Chris Clark | 11th floor flood test for showers | |||
Plumbing - Sewer | Available | |||||||
Plumbing - Storm Drainage | Passed | Approved | June 26, 2019 11:47 AM | Chris Clark | Strom drains 00 though 1st floor | |||
Plumbing - Rough In | Passed | Approved | March 11, 2020 12:00 PM | Chris Clark | 3/10/20 signed and dated job site prints. | |||
Plumbing - Rough In | Failed | Disapproved | April 18, 2019 10:10 AM | Chris Clark | 2 inch p trapes for showers not vented | |||
Plumbing - Rough In | Canceled | Not Applicable | April 25, 2019 12:00 AM | Chris Clark | ||||
Plumbing - Rough In | Failed | Disapproved | April 29, 2019 9:16 AM | Chris Clark | Called 817 435 0276 no answer, called 336 963 3752 no answer, | |||
Plumbing - Rough In | Passed | Approved | April 30, 2019 11:12 AM | Chris Clark | Partial: North wall plentum Room A-10 though A-17 | |||
Plumbing - Rough In | Failed | Disapproved | May 6, 2019 10:21 AM | Chris Clark | Called 8434783604 no answer, could not leave messge, | |||
Plumbing - Rough In | Failed | Disapproved | May 8, 2019 9:08 AM | Chris Clark | Called Duston Hale at 843 478 3604---- 4 times and got no answer, could not leave a message. Need contractor on site to meet | |||
Plumbing - Rough In | Passed | Approved | May 10, 2019 10:26 AM | Chris Clark | Partial : south wall 1st floor 01A 1-6, 01A 7-9 | |||
Plumbing - Rough In | Passed | Approved | May 16, 2019 10:14 AM | Chris Clark | Partial: Level 00 Area A1 Column lines 13-15 Level OB Area A1 Column lines 13-15 Level 00 Area A2 Column lines 7-12 Level 00, A1, A2 Column lines 12-9 Northside | |||
Plumbing - Rough In | Passed | Approved | May 29, 2019 9:12 AM | Chris Clark | Partial: DWV for OT, Domestic water on OT,OO,OB | |||
Plumbing - Rough In | Canceled | Not Applicable | June 10, 2019 12:00 AM | Chris Clark | ||||
Plumbing - Rough In | Failed | Disapproved | June 11, 2019 10:07 AM | Chris Clark | Need a dry vent between the first two upstream water closets for a circuit vent system | |||
Plumbing - Rough In | Canceled | Not Applicable | June 12, 2019 12:00 AM | Chris Clark | ||||
Plumbing - Rough In | Passed | Approved | June 18, 2019 10:07 AM | Chris Clark | Partial: L-01 A-1, L-02 A-1 | |||
Plumbing - Rough In | Passed | Approved | June 18, 2019 10:07 AM | Chris Clark | ||||
Plumbing - Rough In | Passed | Approved | June 24, 2019 1:47 PM | Chris Clark | 6 inch roof drain tested, 8 inch sanitary tested | |||
Plumbing - Rough In | Passed | Approved | June 28, 2019 10:44 AM | Chris Clark | Storm drians 1st though 3rd, signed Deans drwaing for domestic water and dwv | |||
Plumbing - Rough In | Passed | Approved | July 12, 2019 10:35 AM | Chris Clark | Lavel 1 Area A waste and vent, Drawings signed and dated | |||
Plumbing - Rough In | Passed | Approved | July 12, 2019 12:00 AM | Chris Clark | Level OT Area B waste and vent, drawings signed and dated | |||
Plumbing - Rough In | Passed | Approved | July 16, 2019 9:54 AM | Chris Clark | Domestic Water L-02, A -1 area | |||
Plumbing - Rough In | Passed | Approved | July 19, 2019 10:06 AM | Chris Clark | Deans drawings signed and dated | |||
Plumbing - Rough In | Passed | Approved | July 26, 2019 9:54 AM | Chris Clark | 2nd floor domestic water Deans drawings marked and signed. | |||
Plumbing - Rough In | Passed | Approved | August 1, 2019 10:15 AM | Chris Clark | Domestic water lines in basement for hose bibbs, Signed and dated drawings. | |||
Plumbing - Rough In | Passed | Approved | August 6, 2019 9:37 AM | Chris Clark | Domestic test on 2nd floor, DWV test on 3rd, drawings signed and dated | |||
Plumbing - Rough In | Passed | Approved | August 13, 2019 10:23 AM | Chris Clark | Drawings signed and dated | |||
Plumbing - Rough In | Passed | Approved | August 20, 2019 9:34 AM | Chris Clark | Domestic Water: Drawings signed and dated | |||
Plumbing - Rough In | Passed | Approved | August 23, 2019 10:11 AM | Chris Clark | Domestic water over head: drawings signed and dated | |||
Plumbing - Rough In | Passed | Approved | August 28, 2019 9:47 AM | Chris Clark | Domestic water: Signed and dated drawings | |||
Plumbing - Rough In | Passed | Approved | September 11, 2019 10:10 AM | Chris Clark | Domestic Water And DWV Signed and dated Deans drawings. | |||
Plumbing - Rough In | Passed | Approved | September 17, 2019 10:46 AM | Chris Clark | Domestic Water: signed and dated Deans drawings | |||
Plumbing - Rough In | Failed | Disapproved | September 19, 2019 3:45 PM | Chris Clark | Not Ready | |||
Plumbing - Rough In | Passed | Approved | September 23, 2019 10:26 AM | Chris Clark | Partial: 6th floor Domestic water, signed and dated Deans drawings | |||
Plumbing - Rough In | Passed | Approved | September 30, 2019 11:13 AM | Chris Clark | Partial: signed and dated Deans drawings | |||
Plumbing - Rough In | Passed | Approved | October 3, 2019 11:38 AM | Chris Clark | Partial Domestic water pipe on the 6th floor, Area B, signed and dated drawings | |||
Plumbing - Spot Check | Passed | Approved | October 4, 2019 10:46 AM | Chris Clark | Looked at one tub connection for 200 tubs | |||
Plumbing - Rough In | Passed | Approved | October 9, 2019 10:47 AM | Chris Clark | Partial: domestic water on 3rd and 4th Signed and dated Deans drawings | |||
Plumbing - Rough In | Passed | Approved | October 15, 2019 10:47 AM | Chris Clark | Signed and dated Deans drawings | |||
Plumbing - Rough In | Passed | Approved | October 24, 2019 11:10 AM | Chris Clark | Partial: Signed and dated Deans drawings. | |||
Plumbing - Rough In | Passed | Approved | October 28, 2019 11:14 AM | Chris Clark | Partial: Signed and Dated Deans drawings | |||
Plumbing - Rough In | Failed | Disapproved | October 31, 2019 1:57 PM | Chris Clark | Not Ready | |||
Plumbing - Rough In | Passed | Approved | November 1, 2019 11:20 AM | Chris Clark | Partial Drawings dated and signed | |||
Plumbing - Rough In | Passed | Approved | November 5, 2019 10:55 AM | Chris Clark | Partial Drawings Dated and signed | |||
Plumbing - Rough In | Canceled | Not Applicable | November 12, 2019 12:00 AM | Chris Clark | ||||
Plumbing - Rough In | Canceled | Not Applicable | November 13, 2019 12:00 AM | Chris Clark | ||||
Plumbing - Rough In | Failed | Disapproved | November 15, 2019 11:10 AM | Chris Clark | Missing hangers on cast iron pipe on 7th floor ceiling | |||
Plumbing - Rough In | Passed | Approved | November 21, 2019 10:38 AM | Chris Clark | Partial: Drawings signed and dated | |||
Plumbing - Rough In | Passed | Approved | November 21, 2019 10:39 AM | Chris Clark | ||||
Plumbing - Rough In | Passed | Approved | December 5, 2019 10:29 AM | Chris Clark | Partial: Domestic Water Signed and Dated Kenny Drawings | |||
Plumbing - Rough In | Canceled | Not Applicable | December 9, 2019 12:00 AM | Chris Clark | ||||
Plumbing - Rough In | Passed | Approved | December 12, 2019 11:27 AM | Chris Clark | Singed and Dated drawings | |||
Plumbing - Rough In | Failed | Disapproved | December 13, 2019 10:18 AM | Chris Clark | Not Ready | |||
Plumbing - Rough In | Passed | Approved | December 17, 2019 10:32 AM | Chris Clark | Partial: Signed and Dated Drawings, Flood tested showers on 1 st floor | |||
Plumbing - Rough In | Passed | Approved | December 20, 2019 10:05 AM | Chris Clark | Partial Dated and Signed drawings | |||
Plumbing - Rough In | Failed | Disapproved | January 3, 2020 10:36 AM | Chris Clark | Missing mid straping and hangers in ceiling, also dwv test is down | |||
Plumbing - Rough In | Passed | Approved | January 8, 2020 10:49 AM | Chris Clark | Partial: Signed and dated drawings | |||
Plumbing - Rough In | Passed | Approved | January 14, 2020 10:02 AM | Chris Clark | Signed and Dated Drawings | |||
Plumbing - Rough In | Passed | Approved | January 21, 2020 10:32 AM | Chris Clark | Partial: Dated and signed drawings | |||
Plumbing - Rough In | Passed | Approved | January 30, 2020 10:42 AM | Chris Clark | Partial: Dated and Signed drawings | |||
Plumbing - Rough In | Passed | Approved | February 5, 2020 10:37 AM | Chris Clark | Flood test for 4A | |||
Plumbing - Rough In | Passed | Approved | February 11, 2020 11:08 AM | Chris Clark | Partial: Signed and dated drawings | |||
Plumbing - Rough In | Passed | Approved | February 12, 2020 9:32 AM | Chris Clark | Flood test | |||
Plumbing - Rough In | Passed | Approved | February 13, 2020 9:58 AM | Chris Clark | Partial: Signed and dated drawings. | |||
Plumbing - Rough In | Passed | Approved | February 14, 2020 9:56 AM | Chris Clark | 6th floor flood test good | |||
Plumbing - Rough In | Passed | Approved | February 17, 2020 11:04 AM | Chris Clark | Partial: Signed and dated drawings | |||
Plumbing - Rough In | Failed | Disapproved | February 27, 2020 11:00 AM | John McLean | Contractor said Chris Clark needed to see inspection and wil reschedule for next week | |||
Plumbing - Rough In | Passed | Approved | March 3, 2020 11:08 AM | Chris Clark | Partial: signed and dated drawings | |||
Plumbing - Rough In | Passed | Approved | March 6, 2020 11:09 AM | Chris Clark | Partial: singed and dated plumbing drawings | |||
Plumbing - Rough In | Passed | Approved | March 18, 2020 3:25 PM | Chris Clark | Partial: Signed and Dated drawings | |||
Plumbing - Rough In | Passed | Approved | March 20, 2020 3:02 PM | Chris Clark | Partial: Flood test patience rooms, 8th floor | |||
Plumbing - Rough In | Failed | Disapproved | March 25, 2020 11:03 AM | Chris Clark | Not ready | |||
Plumbing - Rough In | Passed | Approved | March 26, 2020 9:55 AM | Chris Clark | Partial: Flood test patience rooms 8th floor | |||
Plumbing - Rough In | Canceled | Not Applicable | March 30, 2020 12:00 AM | Chris Clark | ||||
Plumbing - Rough In | Passed | Approved | April 3, 2020 10:36 AM | Chris Clark | Partial: Flood test 9th floor | |||
Plumbing - Rough In | Passed | Approved | April 3, 2020 10:36 AM | Chris Clark | Pressure test 1st floor main loop | |||
Plumbing - Rough In | Failed | Disapproved | April 7, 2020 11:07 AM | Chris Clark | No answer from Robert Athey, | |||
Plumbing - Rough In | Passed | Approved | April 9, 2020 3:13 PM | Chris Clark | partial: Signed and dated paper work in office | |||
Plumbing - Rough In | Canceled | Not Applicable | April 13, 2020 12:00 AM | Chris Clark | ||||
Plumbing - Rough In | Failed | Disapproved | April 14, 2020 9:42 AM | Chris Clark | Called Robert and Matt, no answer no call back, left message with matt | |||
Plumbing - Rough In | Passed | Approved | April 15, 2020 10:16 AM | Chris Clark | Partial: Flood test on 9th floor | |||
Plumbing - Rough In | Failed | Disapproved | April 28, 2020 9:33 AM | Chris Clark | Not ready | |||
Plumbing - Rough In | Passed | Approved | April 29, 2020 10:01 AM | Chris Clark | 11th floor flood test south side | |||
Plumbing - Rough In | Passed | Approved | May 7, 2020 10:36 AM | Chris Clark | Signed and dated drawings | |||
Plumbing - Rough In | Passed | Approved | May 14, 2020 1:06 PM | Chris Clark | Flood test of showers 10th floor north side | |||
Plumbing - Rough In | Passed | Approved | May 27, 2020 9:55 AM | Chris Clark | 3 inch p trap for ice machine on 11th floor. | |||
Plumbing - Final | Canceled | Not Applicable | July 2, 2020 10:15 AM | Chris Clark | Contractor called and canceled | |||
Plumbing - Final | Failed | Disapproved | October 28, 2020 11:16 AM | Chris Clark | Called Dave, no answer, left message. | |||
Plumbing - Spot Check | Passed | Approved | July 7, 2020 11:11 AM | Chris Clark | 11th floor flood test | |||
Plumbing - Spot Check | Passed | Approved | July 9, 2020 11:20 AM | Chris Clark | 3rd floor final | |||
Plumbing - Spot Check | Passed | Approved | August 4, 2020 10:44 AM | Chris Clark | 11th and 10th floor flood test for ADA showers | |||
Plumbing - Rough In | Failed | Disapproved | August 19, 2020 10:22 AM | Chris Clark | contractor not ready | |||
Plumbing - Rough In | Canceled | Not Applicable | August 24, 2020 10:47 AM | Chris Clark | contractor called and canceled | |||
Plumbing - Rough In | Passed | Approved | August 25, 2020 9:39 AM | Chris Clark | One sink on first floor | |||
Plumbing - Final | Failed | Disapproved | October 29, 2020 10:12 AM | Chris Clark | partial: 4th floor safe rooms not complete, Drinking cooler needs 27 inches knee space. | |||
Plumbing - Final | Failed | Disapproved | March 5, 2021 12:49 PM | 6th floor- Caulk lavs to wall in 6B26, toilets in 6B29, 6B30 and 6B 36 more than 18" from side wall, no water to drinking fountain at bathroom 6A00T2 | ||||
Plumbing - Rough In | Failed | Disapproved | December 16, 2020 10:56 AM | Chris Clark | Vent pipe must be 6 inches above flood level rin of fixture before turning horizontal. | |||
Plumbing - Rough In | Passed | Approved | December 18, 2020 10:22 AM | Chris Clark | Starbucks area | |||
Plumbing - Rough In | Passed | Approved | December 29, 2020 10:17 AM | Chris Clark | Four sinks on the 2nd floor | |||
Plumbing - Rough In | Passed | Approved | February 2, 2021 10:01 AM | Chris Clark | Water distribution pipe feeding dialysis boxes | |||
Plumbing - Rough In | Failed | Disapproved | February 12, 2021 1:18 PM | Chris Clark | Partial: Need to see cleanouts in wall completed, Need to see vet tyed into ceiling, OK to remove test. | |||
Plumbing - Rough In | Failed | Disapproved | 100 | February 16, 2021 9:53 AM | Chris Clark | Cleanouts not complete on 11th floor | ||
Plumbing - Rough In | Failed | Disapproved | February 22, 2021 11:24 AM | Chris Clark | Call james, No answer left message | |||
Plumbing - Rough In | Passed | Approved | February 23, 2021 11:34 AM | Chris Clark | Dialysis connection complete | |||
Plumbing - Final | Passed | Approved | March 22, 2021 10:43 AM | Chris Clark | Partial: 9th floor complete | |||
Plumbing - Final | Failed | Disapproved | March 23, 2021 11:24 AM | Chris Clark | bathroom 10B54T needs 60 inches from side wall of water closet to shower wall | |||
Plumbing - Final | Failed | Disapproved | 100 | March 25, 2021 10:23 AM | Chris Clark | Room 11A00T1 needs 60 inches from side wall of water closet to Lav, Several ADA bathrooms were locked, unable to inspect | ||
Plumbing - Final | Failed | Disapproved | 100 | March 29, 2021 11:46 AM | Chris Clark | 7th floor ADA bathrooms have issues, need full inspection on ADA Hall bathrooms. | ||
Plumbing - Final | Failed | Disapproved | March 31, 2021 9:58 AM | Chris Clark | Called James and left message to meet at loading dock, no answer | |||
Plumbing - Final | Passed | Approved | April 1, 2021 10:15 AM | Chris Clark | Partial: 8 floor complete......10th floor complete | |||
Plumbing - Final | Failed | Disapproved | April 6, 2021 9:47 AM | Chris Clark | Called James several times, no answer, left message. | |||
Plumbing - Final | Passed | Approved | April 7, 2021 10:21 AM | Chris Clark | Partial: 6th and 7th floor complete | |||
Plumbing - Final | Failed | Disapproved | April 8, 2021 10:58 AM | Chris Clark | GC not ready | |||
Plumbing - Final | Failed | Disapproved | April 12, 2021 10:16 AM | Chris Clark | Starbucks area: Mp sinks needs to be caullked, three compartment sink needs to be secured to the wall and sealed, Missing 1022 dual check on ice maching, Gang bathroom ada bathroom stall handle needs to be on wide side. | |||
Plumbing - Final | Canceled | Not Applicable | August 12, 2021 12:00 AM | Chris Clark | ||||
Plumbing - Above Ceiling | Passed | Approved | June 14, 2021 1:10 PM | Chris Clark | level 2 Room 10 | |||
Plumbing - Rough In | Passed | Approved | July 23, 2021 9:15 AM | Chris Clark | All Dialysis stainless steel lines are complete | |||
Plumbing - Above Ceiling | Passed | Approved | August 2, 2021 10:50 AM | Chris Clark | Cath Lab | |||
Plumbing - Rough In | Passed | Approved | August 2, 2021 10:50 AM | Chris Clark | 2nd floor patient room | |||
Plumbing - Final | Passed | Approved | August 16, 2021 8:59 AM | Chris Clark | Floor 1,2,3,4 all complete except Room 10 on 1st & 2nd floor, Also Cath lab area on 1st floor needs to be completed. OB, OO, OT are all complete and inspected. | |||
Plumbing - Rough In | Passed | Approved | September 15, 2021 10:33 AM | Chris Clark | Star bucks complete also gang bathrooms on 1 st floor Also flood test on 1st floor and 2nd floor patient rooms | |||
Plumbing - Final | Passed | Approved | October 14, 2021 1:17 PM | Chris Clark | Partial: Room 10 on the 1st and 2nd floor | |||
Plumbing - Final | Passed | Approved for Occupancy | October 22, 2021 11:04 AM | Chris Clark | Cath lab complete |