BUILDING - Footing |
Passed |
Approved |
|
January 12, 2023 9:53 AM |
Shaun Liggett |
|
footing approved- soils report thrid party inspection form online |
|
BUILDING - Foundation |
Passed |
Approved |
|
January 12, 2023 9:53 AM |
Shaun Liggett |
|
foundation approved- crawl open vent graded smooth drains to gravel sump footing drain and damproofing present on perimeter |
|
BUILDING - Slab |
Available |
|
|
|
|
|
|
|
BUILDING - Framing |
Failed |
Disapproved |
100 |
February 23, 2023 12:00 AM |
Peter Gervais |
|
Items in list apply to all level of buidling and both units: 1) Install air barrier at chases exterior walls 2) Complete fire blocking at all chase 3) Install mending plate at over notched top plates lineset both 4) Complete fire blocking and seal at knee wall stairs 5) Nail 2 ply joists 16 inches oc 6) Missing double joists 2nd fl ceiling per drawing S2 7) 2 nails each side of joists at ledger strips 8) Seal top plates throughout 9) Install blocking at eaves per S3 and D2 10) install missing croos brace per S3 11) Shim jack and king studs as needed 12) Nail both sides of stud columns 16 inches oc per detail 13) Missing blocking between floors per structural drawings 14) Girder in crawl should have 1/2 gap from block wall - dont insulate - pay fee before next inspection |
|
BUILDING - Insulation |
Failed |
Disapproved |
|
March 1, 2023 9:00 AM |
Todd Miller |
|
1) Install air barriers in chases and at concealed area under stairs 2) install depth markers in attic |
|
BUILDING - Final |
Failed |
Disapproved |
|
June 9, 2023 12:13 PM |
Todd Miller |
|
Install address numbers and downspout extensions - received all paperwork |
|
BUILDING - Spot Check |
Available |
|
|
|
|
|
|
|
BUILDING - Other |
Available |
|
|
|
|
|
|
|
BUILDING - Angle |
Available |
|
|
|
|
|
|
|
BUILDING - Final/Multi-Family |
Available |
|
|
|
|
|
|
|
BUILDING - Above Ceiling |
Available |
|
|
|
|
|
|
|
BUILDING - Stocking |
Available |
|
|
|
|
|
|
|
BUILDING - Framing |
Passed |
Approved |
|
February 27, 2023 11:35 AM |
Todd Miller |
|
Previous items corrected - porch not built yet
|
|
BUILDING - Insulation |
Passed |
Approved |
|
March 2, 2023 8:17 AM |
Todd Miller |
|
Batts in walls and inaccessible ceilings
|
|
BUILDING - Final |
Passed |
Approved for Occupancy |
|
June 14, 2023 10:01 AM |
Todd Miller |
|
|
|