BUILDING - Footing |
Passed |
Approved |
|
January 5, 2023 9:32 AM |
Steve Crist |
|
3rd party report attached |
|
BUILDING - Foundation |
Passed |
Approved |
|
January 17, 2023 9:58 AM |
Steve Crist |
|
Slab on grade |
|
BUILDING - Slab |
Passed |
Approved |
|
January 5, 2023 9:32 AM |
Steve Crist |
|
3rd party report attached |
|
BUILDING - Framing |
Failed |
Disapproved |
|
March 27, 2023 10:15 AM |
Steve Crist |
|
1) Screw or bolt 4 ply LVL 1st floor 2) Landing ledger strips require 2 nails each side each joist 3) Check hold downs |
|
BUILDING - Insulation |
Passed |
Approved |
|
March 30, 2023 10:52 AM |
Steve Crist |
|
Walls and ceilings batted, doors and windows sealed. |
|
BUILDING - Final |
Failed |
Disapproved |
|
September 28, 2023 10:55 AM |
Karey McConnell |
|
Final Disapproved 1) Need structural concrete tickets. Need final termite certification. 2) Smoke detector right outside 2nd floor bath door. Move 3 foot per 314. 3) 1st floor at scuttle closet seal at all penetrations. 4) Complete information on EEC 5) Grade at exterior need 6 inches in 10 foot or drainage system to remove water from slab foundation. |
|
BUILDING - Spot Check |
Available |
|
|
|
|
|
|
|
BUILDING - Other |
Available |
|
|
|
|
|
|
|
BUILDING - Angle |
Available |
|
|
|
|
|
|
|
BUILDING - Final/Multi-Family |
Available |
|
|
|
|
|
|
|
BUILDING - Above Ceiling |
Available |
|
|
|
|
|
|
|
BUILDING - Stocking |
Available |
|
|
|
|
|
|
|
BUILDING - Framing |
Passed |
Approved |
|
March 30, 2023 10:52 AM |
Steve Crist |
|
Corrections completed |
|
BUILDING - Final |
Passed |
Approved for Occupancy |
|
November 15, 2023 9:41 AM |
Steve Crist |
|
Engineering, transportation signoffs required. |
|