BUILDING - Footing |
Available |
|
|
|
|
|
|
|
BUILDING - Foundation |
Available |
|
|
|
|
|
|
|
BUILDING - Slab |
Failed |
Disapproved |
|
November 23, 2022 12:00 AM |
Peter Gervais |
|
Provide design professional form
|
|
BUILDING - Framing |
Failed |
Disapproved |
|
November 23, 2022 12:00 AM |
Peter Gervais |
|
Provide foundation survey and design professional form for slab |
|
BUILDING - Insulation |
Passed |
Approved |
|
December 29, 2022 12:00 AM |
Peter Gervais |
|
observed batts throughout - double R-19 and regular R-38 in ceiling |
|
BUILDING - Final |
Failed |
Disapproved |
|
July 27, 2023 12:00 AM |
Peter Gervais |
|
1) To much water added to concrete mix tickets 10 & 12. Have slabs tested in 3 different locations and provide a stamped engineering letter with plan view showing testing locations. 2) Install air barrier at mechanical room 2nd floor front that shares wall with interior space - Address per foundation survey |
|
BUILDING - Spot Check |
Available |
|
|
|
|
|
|
|
BUILDING - Other |
Available |
|
|
|
|
|
|
|
BUILDING - Angle |
Available |
|
|
|
|
|
|
|
BUILDING - Final/Multi-Family |
Available |
|
|
|
|
|
|
|
BUILDING - Above Ceiling |
Available |
|
|
|
|
|
|
|
BUILDING - Stocking |
Available |
|
|
|
|
|
|
|
BUILDING - Framing |
Failed |
Disapproved |
|
November 29, 2022 1:39 PM |
Steve Crist |
|
1) Provide TJI layout 2) Seal kneewall blocking 3) Missing anchor bolts including within 12 in. of doors 4) Missing hold downs rear wall 5) Strap stairwell wall 6) Plans call for screws in 2nd floor studs 7) Fire block shower seat end 8) Fire block and seal top of HVAC chase over stair. // Do not insulate |
|
BUILDING - Slab |
Passed |
Not Applicable |
|
December 29, 2022 12:00 AM |
Peter Gervais |
|
Design professional form online |
|
BUILDING - Framing |
Failed |
Disapproved |
100 |
December 14, 2022 11:03 AM |
Shaun Liggett |
|
framing failed- repeat items 2) Seal kneewall blocking 4) Missing hold downs rear wall complete with anchor bolts 6) Plans call for screws in 2nd floor studs - letter provided is not followed for hinge point studs to attach to wall not roof rafters 7) Fire block shower seat end 8) Fire block and seal top of HVAC chase over stair. // Do not insulate- pay fee before scheduling next inspection |
|
BUILDING - Framing |
Passed |
Approved |
|
December 22, 2022 12:26 PM |
Shaun Liggett |
|
framing approved |
|
BUILDING - Final |
Failed |
Disapproved |
|
August 29, 2023 12:00 AM |
Peter Gervais |
|
1) Too much water added to concrete mix tickets 10 & 12. Have slabs tested in 3 different locations and provide a stamped engineering letter with plan view showing testing locations. |
|
BUILDING - Final |
Passed |
Approved for Occupancy |
|
September 6, 2023 8:04 AM |
Todd Miller |
|
|
|