BUILDING - Footing |
Available |
|
|
|
|
|
|
|
BUILDING - Foundation |
Available |
|
|
|
|
|
|
|
BUILDING - Slab |
Available |
|
|
|
|
|
|
|
BUILDING - Framing |
Failed |
Disapproved |
|
November 23, 2022 2:28 PM |
Todd Miller |
|
1) foam insulate electrical boxes on exterior walls 2) seal top and bottom of chases on 2nd floor 3) firestop all plumbing penetrations and at tub drain 4) install hangers on ceiling joists at top of stair 5) firestop blocking at stair stringers 6) need 2x2 plate washers at front portal frame 7) missing anchor bolt nuts and washers throughout 8) fireblock furred out wall in kitchen - do not insulate |
|
BUILDING - Insulation |
Canceled |
Not Applicable |
|
November 29, 2022 12:00 AM |
Todd Miller |
|
|
|
BUILDING - Final |
Failed |
Disapproved |
|
June 9, 2023 9:12 AM |
Todd Miller |
|
1) Post address numbers 2) install 5-foot downspout extensions 3) post EEC in kitchen sink cabinet 4) repair drywall in water heater space and seal all penetrations 5) 2nd floor windows with sills less than 24 inches above finished floor require fall protection 6) provide ladder for attic access ( make sure access scuttle is weatherstripped and the cover is insulated) - received all other paperwork |
|
BUILDING - Spot Check |
Available |
|
|
|
|
|
|
|
BUILDING - Other |
Available |
|
|
|
|
|
|
|
BUILDING - Angle |
Available |
|
|
|
|
|
|
|
BUILDING - Final/Multi-Family |
Available |
|
|
|
|
|
|
|
BUILDING - Above Ceiling |
Available |
|
|
|
|
|
|
|
BUILDING - Stocking |
Available |
|
|
|
|
|
|
|
BUILDING - Framing |
Passed |
Approved |
|
November 28, 2022 10:52 AM |
Todd Miller |
|
|
|
BUILDING - Insulation |
Passed |
Approved |
|
December 5, 2022 11:07 AM |
Todd Miller |
|
Batts throughout |
|
BUILDING - Final |
Passed |
Approved for Occupancy |
|
July 10, 2023 10:14 AM |
Todd Miller |
|
|
|