Related Permit Details
Application/Permit Information
Application/Permit Number:
Application Type:
Application Date:
Status:
Project Name:
Project Description:
Type | Status | Outcome | Cost | Date | Inspector | Checklist | Inspector Notes | General Notes |
---|---|---|---|---|---|---|---|---|
Electrical - Rough In | Failed | Disapproved | 100 | February 7, 2023 11:16 AM | Chris Januzys | 1-Not ready, still installing boxes/MC cable and making ground joints to MC Cable 2-Loose fittings throughout space 3-MC 1 hole straps need to be 1 1/4 inch from face of stud 4-Re-attach MC supports where removed 5-Move all material from walls that are 1 sided with drywall so inspection can take place | ||
Electrical - Rough In | Passed | Approved | April 6, 2023 2:48 PM | Chris Januzys | Inspected hard ceiling front right office hallway and office behind front lobby | |||
Electrical - Spot Check | Passed | Approved | May 25, 2023 1:53 PM | Chris Januzys | (2) new floor boxes | |||
Electrical - Service Pole | Available | |||||||
Electrical - Temporary Service | Available | |||||||
Electrical - Above Ceiling | Passed | Approved | March 30, 2023 2:52 PM | Chris Januzys | Partial A/C ok, marked on GC's plans. Hard ceilings in bathrooms, and right side left and right of hall offices only, no hall inspections completed | |||
Electrical - Stocking | Available | |||||||
Electrical - Underground | Passed | Approved | January 12, 2023 12:02 PM | Chris Januzys | Floor boxes and conduit | |||
Electrical - Panels/Service | Passed | Approved | March 22, 2023 1:03 PM | Chris Januzys | looked at 3 panels 120/208 volt and 1 step down transformer | |||
Electrical - Roof Top | Available | |||||||
Electrical - Floor Heat | Available | |||||||
Electrical - Rough In | Passed | Approved | February 8, 2023 10:12 AM | Chris Januzys | Corrections made | |||
Electrical - Above Ceiling | Canceled | Not Applicable | April 10, 2023 12:00 AM | Ron Watson | ||||
Electrical - Above Ceiling | Passed | Approved | April 12, 2023 3:01 PM | Chris Januzys | Complete A/C for Phase 1. | |||
Electrical - Final | Passed | Approved | April 19, 2023 2:37 PM | Chris Januzys | Phase 2 ok | |||
Electrical - Rough In | Passed | Approved | May 16, 2023 1:37 PM | Chris Januzys | ||||
Electrical - Above Ceiling | Failed | Disapproved | June 12, 2023 12:00 AM | Brian Dillard | 1-label disconnects in ceiling 2-ground all octagon boxes and strap MC within 12" of octagon boxes 3-ID support wire as independant of ceiling wire 4-cannot use SO type cords above suspended ceilings or in plenum ceilings | |||
Electrical - Above Ceiling | Passed | Approved | June 13, 2023 1:30 PM | Chris Januzys | corrections made | |||
Electrical - Final | Passed | Approved for Occupancy | June 28, 2023 1:39 PM | Chris Januzys |